B.O. (FTD) No.264/2025 (DGE/G2/AEE3/THEP-Part (4)) Thottiyar 40 (1×10+1×30) MW Hydro Electric Project Supply, installation, testing and commissioning of firefighting system – Time extension – Sanctioned Date: 2025-05-20subinMay 25, 2025